Friday, April 13, 2007

Mount Buller 2 Construction

Reinforcing for a angular column to be formed out and poured onsite.
piping to rear of building where possible kitchen will be located, note the lengths stick ing out of the poured concrete.
view looking down lift shaft, angulal cross bracing for builders to stand on. you can also see pattens from the form work on the concrete.
retaining wall: crushed rock is layed at bottom for drainage... in this application it is about 1m high
timber form work above for concrete slab and retaining wall at base.

Mount Buller Construction


Timber members & steel scaffold hold up ply wood as form work for a concrete base.
Inside the building bondek
is supported by the concrete block walls and steel scaffold in the centre.
Timber stud walls are used for non loadbeaing areas, pipe work is precut through the bondek before the concrete is poured.

Wednesday, April 4, 2007

ceiling framing

this pic shows the detail of a suspended ceiling. It also shows how the electrical wiring is running on support, the column is used to run electricty to the floor level below
This shows the roof structure supported on the concrete bricks and how the connection of the suppended ceiling meets the wall.
Steel roofing members and supports for suspended ceiling
supprt column is filled in with concrete bricks
external gutter detail, the gutter supprted in steer brackets



DETAILS OF DIFFERENT GUTTERING AND ROOF PITCHES. USE OF FLASHING BEING HIGHLY IMPORTANT IN ALL APPLICATIONS.

Wednesday, March 28, 2007

Week3 Composite

This weeks task showing a composite frame, bondek floor supported by the main body structure and additional steel columns to the outside. Simple construction with a suspended ceiling.
Bondek

Tuesday, March 27, 2007

Harbour Bridge Details




The amout of detail within the structure is amazing, re-inforce plating and welds are at a huge scale to accomodate the span and weight.