Friday, April 13, 2007

Mount Buller 2 Construction

Reinforcing for a angular column to be formed out and poured onsite.
piping to rear of building where possible kitchen will be located, note the lengths stick ing out of the poured concrete.
view looking down lift shaft, angulal cross bracing for builders to stand on. you can also see pattens from the form work on the concrete.
retaining wall: crushed rock is layed at bottom for drainage... in this application it is about 1m high
timber form work above for concrete slab and retaining wall at base.

Mount Buller Construction


Timber members & steel scaffold hold up ply wood as form work for a concrete base.
Inside the building bondek
is supported by the concrete block walls and steel scaffold in the centre.
Timber stud walls are used for non loadbeaing areas, pipe work is precut through the bondek before the concrete is poured.