Friday, April 13, 2007

Mount Buller 3 Construction

Double brick retaining wall, to have crushed rock added.
Large retaining wall with steel structure for ski access to the building.
Ag drain to run around the base of the slab, it will have to be connected to site drainage before completion.
Battered earth to back of retaining wall, loose pipes and water at base where ag drain is located or base gutter.
side angle of batter with retaining wall on left. note the moisture in the earth and drainage required to base of retaing wall.

Mount Buller 2 Construction

Reinforcing for a angular column to be formed out and poured onsite.
piping to rear of building where possible kitchen will be located, note the lengths stick ing out of the poured concrete.
view looking down lift shaft, angulal cross bracing for builders to stand on. you can also see pattens from the form work on the concrete.
retaining wall: crushed rock is layed at bottom for drainage... in this application it is about 1m high
timber form work above for concrete slab and retaining wall at base.

Mount Buller Construction


Timber members & steel scaffold hold up ply wood as form work for a concrete base.
Inside the building bondek
is supported by the concrete block walls and steel scaffold in the centre.
Timber stud walls are used for non loadbeaing areas, pipe work is precut through the bondek before the concrete is poured.

Wednesday, April 4, 2007

ceiling framing

this pic shows the detail of a suspended ceiling. It also shows how the electrical wiring is running on support, the column is used to run electricty to the floor level below
This shows the roof structure supported on the concrete bricks and how the connection of the suppended ceiling meets the wall.
Steel roofing members and supports for suspended ceiling
supprt column is filled in with concrete bricks
external gutter detail, the gutter supprted in steer brackets



DETAILS OF DIFFERENT GUTTERING AND ROOF PITCHES. USE OF FLASHING BEING HIGHLY IMPORTANT IN ALL APPLICATIONS.