Trench mesh for slab tied together. Timber formwork to the edges with the waterproof sheeting to the base
Close up of the mesh showing the beams/ sprips to the base of the slab. note the reinforcement rods tied to mesh
Rio bars for possible column tied into mesh.
Rio bars exposed out of slab, internal filled in with slurry mix after slab hardened.