Mount Buller 3 Construction

Double brick retaining wall, to have crushed rock added.
Large retaining wall with steel structure for ski access to the building.
Ag drain to run around the base of the slab, it will have to be connected to site drainage before completion.
Battered earth to back of retaining wall, loose pipes and water at base where ag drain is located or base gutter.
side angle of batter with retaining wall on left. note the moisture in the earth and drainage required to base of retaing wall.